Start Europa Alton Towers Alton Towers Wicker Man Construction Update – 8th July 2017

Alton Towers Wicker Man Construction Update – 8th July 2017

0
Alton Towers Wicker Man Construction Update – 8th July 2017
YouTube

Mit dem Laden des Videos akzeptieren Sie die Datenschutzerklärung von YouTube.
Mehr erfahren

Video laden

Join us as we follow the construction of the new wooden roller coaster, set to open at Alton Towers in spring 2018. Manufactured by Great Coasters International, the ride will be located on the site of the old log flume, a ride that was demolished during late 2016.

As the lift hill reaches its full height, we return back to the site for a look at the work that’s taken place across the past week. Along with sharing plenty of shots of the lift hill we also take a look at the concrete wall that now seems to be complete next to the station, along with a look at the ride from the Congo River Rapids exit bridge. We look forward to sharing this exciting build with regular updates here on Theme Park Worldwide.

Personalised video messages: https://www.cameo.com/shawnsanbrooke
Theme Park Worldwide merchandise: https://teespring.com/en-GB/stores/theme-park-worldwide-shop

Thank You For Watching Theme Park Worldwide ©
Instagram: https://www.instagram.com/themeparkworldwide/?hl=en
Facebook Page: https://www.facebook.com/themeparkworldwide/

Kommentieren Sie den Artikel

Bitte geben Sie Ihren Kommentar ein!
Bitte geben Sie hier Ihren Namen ein